School Improvement Project in Progress
FIDR is conducting a construction work to improve a learning environment of Shiva Basic School and Siddajyoti Harimishra Basic School in Betali, Ramechhap District.
In 2015, a massive earthquake hit Nepal causing lots of damages. As the both schools lost buildings, students had no choice but to study in temporary classrooms made of bamboo--even now. In such a setting, students cannot focus on study when it is windy or rainy although the schools try to protect the rooms using plastic sheets.
Therefore, FIDR started reconstructing the school buildings in September 2018.
After Nepal’s big annual festivals, Dasain and Tihar, were over in November, construction work at the both schools in Ramechhap came into full swing.
As soon as the vacation season finished, the local residents voluntarily fixed the muddy roads and cleared landslide sections caused by rain. Their efforts made it possible to transport materials needed for the construction, and foundation work is now well under way.
Nutrition Education and Promotion Project
2025.06.02
The Story of Change: Turning C...
Pediatric Surgery Project
2025.03.27
A chance to see Health Advance...
Your generous donation now will have impacts
on children and communities in our fields.